|
25-04-2011, 11:13 AM | #41 |
Guest
Posts: n/a
|
haha, i think i will go up to 3 U tubes for any just in case. hee hee.
will need to worry about air lock or blockage if i place air stone nears it. my ideas comes from Aqua Bridge but i will need some very fine netting to prevent shrimplets from crossing over. Last edited by eviltrain; 25-04-2011 at 11:21 AM. |
25-04-2011, 11:35 AM | #42 |
Dragon
Join Date: Aug 2005
Posts: 1,138
|
Yah, I have thought about it before. But the practical aspects of it seem pretty flawed.
|
25-04-2011, 11:56 AM | #44 |
Dragon
Join Date: Aug 2005
Posts: 1,138
|
Got. Go look at the search for habitrail hamster stuff. Only drawback is that you got to seal the tubes yourself. Otherwise I think it would be perfect.
Anyway what is the objective of joining the 2 tanks? |
25-04-2011, 12:06 PM | #45 | |
Guest
Posts: n/a
|
Quote:
the main objective is to have water flow from Tank A to Tank B. The rain bar will be in Tank A, water flow through the bridge and into Tank B. The inlet of the filtration system will be the under gravel system in Tank B. Schematic will be :- Tank A -> Water Bridge -> Tank B -> Under Gravel Panel -> Pre Filter -> Ehiem 2026 (plug in) -> Jet 3688 (dummy)-> chiller-> Rain Bar -> Tank A. Last edited by eviltrain; 25-04-2011 at 12:07 PM. |
|
25-04-2011, 12:22 PM | #46 |
Dragon
Join Date: Aug 2005
Posts: 1,138
|
Hehehe. Chiller saving solution eh. I like the idea.
Your ehiem is going to be way over worked. Provided you can get an equilibrium in the flow that is. |
25-04-2011, 12:29 PM | #47 |
Guest
Posts: n/a
|
hee hee, i can always plug in my Jet 3688 to have higher flow rate if my ehiem decided to rest. BTW, the flow rate now without Tank A and the bridge is around 600LPH as indicated on the gauge of my Ehiem 2026.
Last edited by eviltrain; 25-04-2011 at 12:32 PM. |
25-04-2011, 12:30 PM | #48 |
Dragon
Join Date: Aug 2005
Posts: 1,138
|
Good luck. Keep us posted on the progress.
Hehehe. Actually already got a vertical version of this, it's called a sump tank. LOL Have fun on your project! Last edited by cheetf; 25-04-2011 at 12:33 PM. |
25-04-2011, 12:36 PM | #49 |
Guest
Posts: n/a
|
Sure! thanks for your advice given too~
but i think vertical version will be overflow. this will be horizontal flow. |
26-04-2011, 06:09 PM | #50 |
Arofanatic
Join Date: Feb 2011
Posts: 168
|
Drill hole on both side of the tank and connect using PVC pipe? I got 15mm hole saw can lend you. Confirm fail safe but need to clear the life stock to my tank first before drilling...
|
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|