Arofanatics Fish Talk Forums  

Go Back   Arofanatics Fish Talk Forums > General Aquatic Forums > Freshwater Invertebrates Forum

Reply
 
Thread Tools Display Modes
Old 30-07-2011, 11:49 AM   #11
avex30
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by rcw View Post
Mine kick in for 5-10mins to bring down to 24
Rest for 30 mins ....

Any problem with mine?
Hmm i use to face that maybe you want to consider DIy the thermostat out to read the temp direct from tank. it will greatly improve the cut in and out.
  Reply With Quote
Old 30-07-2011, 12:01 PM   #12
reaverx
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by avex30 View Post
Currently as you can see the chiller is sitting beside my lower tank. So there is some heat generate during kick in. (As suggested by many helpful bros over the other side will try out all the method to reduce the timing)

Currently

Kick in and last for almost 1 hr to bring down temp
Rest for 45 min before next round.
kick in 1 hr rest 45 min

why kick in so long ?
  Reply With Quote
Old 30-07-2011, 12:04 PM   #13
ronaldlim
Dragon
 
ronaldlim's Avatar
 
Join Date: Nov 2010
Posts: 1,500
Default

Quote:
Originally Posted by avex30 View Post
Hmm how did you see it hahahaha
Maurice Tan
ronaldlim is offline   Reply With Quote
Old 30-07-2011, 12:09 PM   #14
silane
Senior Dragon
 
silane's Avatar
 
Join Date: Jul 2004
Posts: 4,136
Default

Quote:
Originally Posted by avex30 View Post
Boss cool water hahaha I haven't get to that using compressor gas stage (Unless i can find that big coil of flexible stainless steel pipe to experience with like that crazy setup in taiwan using a old air-con unit to do it)
I see, SS pipe should be able to find in Sg but hard to work on, it it not easy to wield like copper pipe.
silane is offline   Reply With Quote
Old 30-07-2011, 12:13 PM   #15
avex30
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by silane View Post
I see, SS pipe should be able to find in Sg but hard to work on, it it not easy to wield like copper pipe.
Yea boss if using compressor need the SS flexible easier to work on with SS hard piping it will be hard to work especially the welding issue if not done properly will leak.
  Reply With Quote
Old 30-07-2011, 12:14 PM   #16
avex30
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by ronaldlim View Post
Maurice Tan
hahaha kk err... you got add me on facebook ??
  Reply With Quote
Old 30-07-2011, 12:18 PM   #17
avex30
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by reaverx View Post
kick in 1 hr rest 45 min

why kick in so long ?
Due to the many turn on the stainless steel pipe and the water in the 2nd tank it will make chilling of the water longer. I mean this are budget setup as compare to running more than 1 chiller or having it in a 24/7 aircon room (unless like bai office got space la 24/7 also no need worried) Or having all your eggs in 1 basket reason. I wish to experience with different water parameter in this case it allow me to do so without the sharing the water.
  Reply With Quote
Old 30-07-2011, 12:27 PM   #18
jweak13
Guest
 
Posts: n/a
Default

Nice! feel like a fridge
  Reply With Quote
Old 30-07-2011, 01:06 PM   #19
ronaldlim
Dragon
 
ronaldlim's Avatar
 
Join Date: Nov 2010
Posts: 1,500
Default

Quote:
Originally Posted by avex30 View Post
hahaha kk err... you got add me on facebook ??
Yeah hahaha
ronaldlim is offline   Reply With Quote
Old 30-07-2011, 01:12 PM   #20
avex30
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by ronaldlim View Post
Yeah hahaha
Oh your name same?? hahaha
  Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +9. The time now is 02:38 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright © 2000-2008 Arofanatics.com (Since 30th August 2000)